Office setup, cabling & CCTV
Moving into a new office, opening a shop or tidying up the one you have? We plan and install the cabling, network cabinet, Wi-Fi, printers, meeting-room screens and CCTV, and hand it over working on day one.
Ready to work when you open the doors
IT is often the last thing on the list when a new office or shop is being fitted out, and that is when problems appear: no internet on opening day, network points in the wrong places or cameras that nobody can view.
We work alongside your fit-out contractor from the start, so cabling, power and equipment are planned properly. Then we install, test and hand over a tidy setup, with clear labels and notes for the future.
What’s included
How an office setup runs
- 01 Survey We look at the floor plan or visit the site and agree what you need.
- 02 Plan We set out the cabling, equipment and costs, and coordinate with your contractor.
- 03 Install We run cables, mount equipment and configure everything on site.
- 04 Hand over We test it all, show your team how it works and keep the notes for later.
Questions about office setup and CCTV
As early as you can, ideally before the fit-out drawings are final. Ordering an internet line and agreeing where network points go both take time.